Anderson, Harlan E., 1929-
Dates
- Existence: 1929
Found in 5 Collections and/or Records:
Minutes of SAGE experimental subsector planning approval committee meeting of 4 April 1955, 1955 April 11
Division 6 Memo M-3516. Minutes of a SAGE experimental subsector planning approval committee meeting discussing operational mode for Bath and Brunswick, Maine; ARDC personnel required; weapons; radar orientation; and telephone facility cost.
MTC Accumulator Test, 1953 March 10
MIT DIC 6889. Project Whirlwind Memo M-1887. A high speed self checking test was used to test the MTC accumulator. Every gate tube and buffer tube was tested at a time when it should pass a pulse and at a time when it should not pass a pulse. Marginal checking of this test indicated that the accumulator had satisfactory margins throughout.
MTC Bootstrap Type Programs, 1953 July 6
MIT DIC 6889. Project Whirlwind Memo M-2282. There have been three bootstrap type programs written and test on MTC. The general characteristics of these are described in this note.
MTC Tests on Magnetic Memory - Automatic Memory Display, 1953 May 5
MIT DIC 6889. Project Whirlwind Memo M-2133. This is the first of a series of M-notes describing procedures, programs, and results of MTC tests on the magnetic memory. Automatic memory display is a simple test procedure for reading, rewriting, and displaying the contents of every magnetic memory address.
Preliminary MTC System Test, 1953 March 6
MIT DIC 6889. Project Whirlwind Memo M-1888. A preliminary test of MTC, using about half of the computer, was performed. The arithmetic element and output scope displays were tested by a fixed program which generated sines and cosines and displayed them.