Group 62 Section Leaders Meeting -- November 9, 1953, 1953 November 09
Scope and Contents
Project Whirlwind Memo M-2518. Considerable attention was given to a review of the power equipment. The Charactron display system has been selected for AN/FSQ-7. The schedule for the MTC construction work is outlined.
Dates
- 1953 November 09
Creator
- Lincoln Laboratory. Division 6 (Publisher, Organization)
Access note
This collection is open.
Extent
From the Collection: 3.9 Gigabytes (4035 MB in 1835 digital files in 31 folders)
From the Collection: 56.3 Cubic Feet (189 boxes including 142 microfilm reels)
Language of Materials
From the Series: English
Creator
- Lincoln Laboratory. Division 6 (Publisher, Organization)
- Gray, Phillip J. (Person)
Repository Details
Part of the Massachusetts Institute of Technology. Libraries. Department of Distinctive Collections Repository
Massachusetts Institute of Technology Libraries
Building 14N-118
77 Massachusetts Avenue
Cambridge MA 02139-4307 US
distinctive-collections@mit.edu