Skip to main content

Group 62 Section Leaders Meeting, July 26, 1954, 1954 July 27

 File — Multiple Containers
Identifier: 16

Scope and Contents

Project Whirlwind Memo M-2938. Effective use of Lincoln manpower contemplates the use of small groups in certain areas and reinforcement of personnel in other areas of activity; namely the Systems Office, Frame Testing, and Duplex Planning. Marginal checking system to be reviewed to determine if degree to which the philosophy has been carried out has not resulted in too elaborate a system. Electronic circuits for display consoles are to be processed through EDO-SO for concurrence and release. A group of people intimately familiar with the electronic hardware will study the programming of the machine to evaluate the compatibility of the equipment and programs. Later schedules for display call for construction of central display frame in November and December of 1954.

Dates

  • 1954 July 27

Creator

Access note

This collection is open.

Extent

From the Collection: 3.9 Gigabytes (4035 MB in 1835 digital files in 31 folders)

From the Collection: 56.3 Cubic Feet (189 boxes including 142 microfilm reels)

Language of Materials

From the Series: English

Creator

Repository Details

Part of the Massachusetts Institute of Technology. Libraries. Department of Distinctive Collections Repository

Contact:
Massachusetts Institute of Technology Libraries
Building 14N-118
77 Massachusetts Avenue
Cambridge MA 02139-4307 US