Skip to main content

Group 62 Section Leaders Meeting - February 15, 1954, 1954 February 16

 File — Multiple Containers
Identifier: 16

Scope and Contents

Project Whirlwind Memo M-2691. Arrangements to have prime responsibility for certain engineering work placed with MIT have been made in the interest of insuring adherence to July '55 date for system operation. Regular air transportation between Poughkeepsie and Cambridge is expected to start approximately March 1, 1954. Consideration is being given to possible alternate sources for Charactron tubes.

Dates

  • 1954 February 16

Creator

Access note

This collection is open.

Extent

From the Collection: 3.9 Gigabytes (4035 MB in 1835 digital files in 31 folders)

From the Collection: 56.3 Cubic Feet (189 boxes including 142 microfilm reels)

Language of Materials

From the Series: English

Creator

Repository Details

Part of the Massachusetts Institute of Technology. Libraries. Department of Distinctive Collections Repository

Contact:
Massachusetts Institute of Technology Libraries
Building 14N-118
77 Massachusetts Avenue
Cambridge MA 02139-4307 US