Group 62 Section Leaders Meeting--August 23, 1954, 1954 August 26
Scope and Contents
Project Whirlwind Memo M-3002. Concurrence with IBM is scheduled for display system and MRI specifications. MTC has been reassembled and will be fully operational by September 1. Components of the 13 most frequently used circuits are to be released for ordering (for 2 Production Systems) in September. First floor equipment layout for production systems is being finalized. Requirements for Power System for production system has been released through the Production Coordination Office.
Dates
- 1954 August 26
Creator
- Lincoln Laboratory. Division 6 (Publisher, Organization)
Access note
This collection is open.
Extent
From the Collection: 3.9 Gigabytes (4035 MB in 1835 digital files in 31 folders)
From the Collection: 56.3 Cubic Feet (189 boxes including 142 microfilm reels)
Language of Materials
From the Series: English
Creator
- Lincoln Laboratory. Division 6 (Publisher, Organization)
- Kromer, Arthur P. (Person)
Repository Details
Part of the Massachusetts Institute of Technology. Libraries. Department of Distinctive Collections Repository
Massachusetts Institute of Technology Libraries
Building 14N-118
77 Massachusetts Avenue
Cambridge MA 02139-4307 US
distinctive-collections@mit.edu