Skip to main content

Selection of a company to work with the Lincoln Laboratory on the transition system, 1953 May 12

 File — Multiple Containers
Identifier: 16

Scope and Contents

Project Whirlwind Memo VI L-95. Memorandum expanding on the information given in the memorandum of November 5, 1952 to Paul Cuslck regarding the selection of the International Business Machines Corporation to be a sub-contractor to the Lincoln Laboratory in preliminary design studies of a digital computer and associated terminal equipment for an air defense control center. Lists considerations in selecting a company, including: key staff, supporting professional staff, technical contribution, transition from development to production, the production organization, service organization and training program, proximity to MIT, ease of information exchange and technical cooperation, estimate of the company's contribution to rapid completion of the program and experience in large-scale computers.

Dates

  • 1953 May 12

Creator

Access note

This collection is open.

Extent

From the Collection: 3.9 Gigabytes (4035 MB in 1835 digital files in 31 folders)

From the Collection: 56.3 Cubic Feet (189 boxes including 142 microfilm reels)

Language of Materials

From the Series: English

Creator

Repository Details

Part of the Massachusetts Institute of Technology. Libraries. Department of Distinctive Collections Repository

Contact:
Massachusetts Institute of Technology Libraries
Building 14N-118
77 Massachusetts Avenue
Cambridge MA 02139-4307 US