Group leaders' meeting, June 7, 1954, 1954 June 7
Scope and Contents
Project Whirlwind Limited Memo L-153. Minutes of weekly group leader meeting discussing concurrence on production FSQ-7's, failure of FSQ-7 primary power, S. E. Desjardins, clearance for IBM visits, Air Force meeting on FSQ-7 prototype program, quality control of FSQ-7 prototypes, cost of duplex combat operation center and display consoles, visit to General Ceramics and IBM, and IBM engineering for duplex central. Presents R. R. Everett, D. R. Brown, S. H. Dodd, A. P. Kromer, J. C. Proctor, N. H. Taylor, C. R. Wieser, and P. Youtz.
Dates
- Creation: 1954 June 7
Creator
- Lincoln Laboratory. Division 6 (Publisher, Organization)
- Brown, David R. (Person)
Extent
From the Collection: 3.9 Gigabytes (4035 MB in 1835 digital files in 31 folders)
From the Collection: 56.3 Cubic Feet (189 boxes including 142 microfilm reels)
Language of Materials
From the Series: English
Repository Details
Part of the Massachusetts Institute of Technology. Libraries. Department of Distinctive Collections Repository
Massachusetts Institute of Technology Libraries
Building 14N-118
77 Massachusetts Avenue
Cambridge MA 02139-4307 US
distinctive-collections@mit.edu