AN/FSQ-7 (XD-1) prototype schedule and installation, 1954 February 26
Scope and Contents
Project Whirlwind Limited Memo L-142. Summary of the status of the XD-1 program, responsibilities assumed by Division 6, finances, assistance from other Lincoln divisions, and Building F urgency.
Dates
- Creation: 1954 February 26
Creator
- Lincoln Laboratory. Division 6 (Publisher, Organization)
- Forrester, Jay W. (Person)
Extent
From the Collection: 3.9 Gigabytes (4035 MB in 1835 digital files in 31 folders)
From the Collection: 56.3 Cubic Feet (189 boxes including 142 microfilm reels)
Language of Materials
From the Series: English
Repository Details
Part of the Massachusetts Institute of Technology. Libraries. Department of Distinctive Collections Repository
Massachusetts Institute of Technology Libraries
Building 14N-118
77 Massachusetts Avenue
Cambridge MA 02139-4307 US
distinctive-collections@mit.edu